I. General parts:
Part AC roof - flat, thermal insulation EPS-10cm on a reinforced concrete slab, protective cement screed 4cm, steel structure, thermopanels 6cm, sheet metal cladding with galvanized sheet metal with PVC coating; gutters - reinforced concrete with PVC lining and funnels; drainage pipes - f75 PVC pipes built into the thermal insulation; thermal insulation - on external walls and roof according to the project by detail/with 10cm EPS/ and mineral wool; facade treatment of walls - granopor and mosaic plaster, facing with granite tiles and architectural elements of etalbond; terrace railings - partially solid reinforced concrete, glass with AL handle; pavement covering - from concrete paving slabs/Bekhaton/; staircase: ceilings - putty with latex; walls - putty with latex; with a plinth of mosaic plaster, steps - granite; railing - metal; mailboxes for each apartment; joinery - common parts and store - AL thermal bridge with three panes of glass; coffee-apéritif-AL thermal bridge with three glasses in combination opening type "Accordion"; entrance door staircase - AL with glazing, with automatic opening; yard and sidewalk area according to the project with landscaping. Part C and K sewerage - in foundations and on floors with PVC pipes, discharged into the street shaft from the city's domestic sewage system; rainwater - discharged into the city sewer for rainwater; water supply - made of PVC pipes and connected to a common water meter to the city water supply; the building is handed over with a common water meter installed. The opening of a water supply lot by the owner of the independent object takes place after the transfer of ownership. Part El. installed main electrical switchboard at the northern regulatory border with space for electricity meters for each subscriber with a completed external connection, legalized by the ERP with readiness to open a batch; completed electrical installation according to an approved project for all common areas, including charging with switches and lighting fixtures and sensors for automatic lighting switching on; completed and rang connections from the electricity meters to the apartments electrical switchboards of all objects in the building with an installed apartment switchboard; implemented low-current installations; installed intercom installation; completed internal telephony to a switchboard ready for connection to a telecommunications network; cabling for security and electric lock entrance with intercom installation; cable ducts from the distribution box to each apartment for SOT and other operators Elevator - automatic, with a stop on each floor, with dimensions according to the approved project, legalized and ready for commissioning by the owners of the apartments;
II. APARTMENTS:
Living rooms, bedrooms: ceilings - gypsum plaster; walls - gypsum plaster; floors - cement screed on thermal insulation for underfloor heating with a heat pump, with installed coils; corridor-placed granite tiles, Sanitary units: ceilings - PVC ceiling with 4 installed. freckles, walls - earthenware, floor - terracotta, one bathroom completely finished with installed sink and toilet bowl; Terraces - executed according to the approved project of facade treatment; under - cement screed with granite tiles, above unheated rooms - thermal and waterproof insulation; Windows - entrance door - armored, metal; internal doors – MDF-white, installed with skirting boards; windows - from PVC-seven-chamber white joinery. Three-pane glazing: external-4mm low-emission glass-four seasons, medium and internal glass-white, with installed handles and locks on the opening windows, installed on all windows external AL window board; Plumbing installation - completed on the plug according to the project, charged in one sanitary unit with a mixer tap; Sewer installation - completed 1st stage - vertical branches according to the project, one toilet is equipped with a toilet bowl and a sink; El. installation - completed 1st stage, with an installed apartment electrical panel according to the project; OVKI - completed first stage with underfloor heating for heat pumps and installed heat pumps. BASEMENT - ceilings - reinforced concrete slab, walls - moisture-resistant plasterboard, floor - reinforced concrete slab, door - metal, electric lighting - completed, connected to the apartment.
III. GARAGES - with distribution according to the project.
Part AC ceilings - smooth concrete surface in the form after demolding; walls - moisture-resistant plasterboard, plastered joints, plaster on brick walls, concrete walls and columns, concrete surface after demolding; floor - concrete surface with a smooth finish, polished concrete; door - mounted, roller shutter, automatic with remote opening; common automatic door at the entrance of garages, sectional, installed with remote opening; Installations garage switchboard - installed; contacts - 2 pcs., installed; lighting lamps according to the project - mounted on the socket; wiring for a garage door, for an electric drive with the possibility of remote control. IV. Industrial goods store:
Walls - plastered, painted white; Ceiling - concrete slab after demolding, with ARMSTRONG suspended ceiling; Under - Arm. cement screed on XPS 4cm with filled granite flooring Sanitary unit-completely finished; Joinery AL external - with thermal bridge, glazed with t
Contacts: Stara Zagora, Voivoda Stoino Chernogorski Str. 27A , +359 42 603 642, office@nikonbg.com